Long-term stability analysis of the left bank abutment slope at Jinping I hydropower station

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:a27155908
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The time-dependent behavior of the left bank abutment slope at Jinping I hydropower station has a major influence on the normal operation and long-term safety of the hydropower station.To solve this problem,a geomechanical model containing various faults and weak structural planes is established,and numerical simulation is conducted under normal water load condition using FLAC~(3D),incorporating creep model proposed based on thermodynamics with internal state variables theory.The creep deformations of the left bank abutment slope are obtained,and the changes of principal stresses and deformations of the dam body are analyzed.The long-term stability of the left bank abutment slope is evaluated according to the integral curves of energy dissipation rate in domain and its derivative with respect to time,and the non-equilibrium evolution rules and the characteristic time can also be determined using these curves.Numerical results show that the left bank abutment slope tends to be stable in a global sense,and the stress concentration is released.It is also indicated that more attention should be paid to some weak regions within the slope in the long-term deformation process. The time-dependent behavior of the left bank abutment slope at Jinping I hydropower station has a major influence on the normal operation and long-term safety of the hydropower station. To solve this problem, a geomechanical model containing various faults and weak structural planes is established, and numerical simulation is conducted under normal water load condition using FLAC ~ (3D), incorporating creep model proposed based on thermodynamics with internal state variables theory. creep deformations of the left bank abutment slope are obtained, and the changes and deformations of the dam body are analyzed the long-term stability of the left bank abutment slope is evaluated according to the integral curves of energy dissipation rate in domain and its derivative with respect to time, and the non-equilibrium evolution rules and the characteristic time can also be determined using these curves. Numerical results show that the left bank abutment slope tends to be stable in a global sense, and the stress concentration is released. It is also indicated that more attention should be paid to some weak regions within the slope in the long-term deformation process.
其他文献
随着科学技术的应用,图书管理也进入了信息化时代.与信息化条件下的图书管理更加自动化及高效,信息处理更多依赖于信息技术,改变了传统的以人工操作为主的图书管理模式.信息
城镇化是中国“最大的内需”,城镇化是未来中国经济社会持续健康发展的动力源……2001年写入国家五年计划纲要的城镇化战略,从未被如此重视,并被置于如此高的地位.特别是中共
期刊
为了能够充分的研究工业化建筑项目的综合效益,必须要建立完善的评价体系,包括评价指标、评价模型构建以及评价结果输出,这样才能够确保对整个工业化建筑项目的经济效益有效
党中央高层领导把产权交易进入市场等四项制度作为今年党风廉政建设的重要内容来抓,并强调指出,在企业的改组、兼并、联合、租赁、承包出售等进行产权交易时,不能由领导者个
随着计算机技术的普及和网络的不断延伸,无纸化办公将变为现实,传统的以纸质为载体的档案管理方式将发生根本的变革.档案管理实现计算机化是大势所趋.作为档案工作者,必须认
灯具、插座、开关及弱电安装,是工程内部装修的重要组成部分,关系着人们的生活起居。下文结合灯具、插座、开关及弱电的各自特点,制定相应的施工工艺流程及方法,以期在施工过程中
期刊
随着素质教育贯彻进程的深入,高校也在不断的探索教学改革的道路,拓宽获取教学信息的渠道,来让学生获取更加丰富的教学资源,从而拓宽学生的视野,让学生了解时代发展的现状,紧
尼雄矿田位于隆格尔-工布江达断隆带,是措勤-申扎铁铜多金属成矿带的重要组成部分。滚纠铁矿位于矿田西北端,矿体主要产于花岗闪长岩和二长花岗岩与二叠系敌布错组的接触带及