论文部分内容阅读
在大型矿山设备安装时,设备机座下配制垫铁组的工作是一项很重要的工序。如果配制不好,造成设备位移并使设备不能正常运转的
In the installation of large-scale mining equipment, the preparation of equipment under the horn group work is a very important process. If the preparation is not good, resulting in equipment displacement and equipment can not be normal operation