近年来塑料膜在水工混凝土浇筑中应用较多,主要是在水上混凝土浇筑中起保浆,光滑表面的作用,对模板的质量要求也小了,不用人工就达到养生的目的。2001年我们在牡丹江市江西坝维修加固工程中遇到一个问题,坝脚基础开挖后,从坝体流出大量水流,在坝脚基础中达1m多深,流量之大,流速之快,如何浇筑才能不跑浆?经研究采用塑料膜铺边和底,效果很好,既节省资金,又加快了工程进度。
In recent years, the application of plastic film in hydraulic concrete pouring is more, mainly in the pouring of water from concrete, smooth surface, the quality requirements of the template is also small, without artificial to achieve the purpose of health. In 2001, we encountered a problem in the repair and reinforcement works of Jiangxi Dam in Mudanjiang City. After foundation excavation of dam foundation, a large amount of water flowed out from the dam body, reaching more than 1 m deep in the foundation of the dam foot. The flow rate was large and the flow rate was fast. How Pouring can not run pulp? The study of plastic film paving and the end, the effect is very good, not only save money, but also speed up the progress of the project.