胜利油田东营市河口社区第三小学综合楼工程,建筑面积4438m2,以混凝土框架结构为主,局部砖砌体结构,框架部分二层以上砌体采用水泥炉渣空心砖,M5水泥砂浆砌筑,底层及砖混结构部分为MU7.5烧结普通砖,M5水泥石灰砂浆砌筑。原设计内墙抹灰为1∶1∶6水泥石灰砂浆打底,找平层厚20mm,刷白色乳胶漆。我单位在征得设计单位同意后,改为采用F型饰面石膏,解决了传统砂浆容易出现空鼓、开裂等质量通
Shengli Oilfield Dongkou City estuary community third elementary school building, construction area of 4438m2, mainly to the concrete frame structure, partial brickwork structure, frame part of the second floor of the masonry cement hollow brick, M5 cement mortar masonry, the bottom and Masonry brick structure part MU7.5 sintered ordinary brick, M5 cement lime mortar masonry. The original design of the inner wall plaster 1: 1: 6 cement lime mortar primer, leveling layer thickness 20mm, white paint brush. My unit with the consent of the design unit, instead of using F-type plaster, to solve the traditional mortar prone to hollowing, cracking and other quality through