论文部分内容阅读
介绍浙江省黄龙体育中心主体育场结构中混凝土吊塔的竖向预应力张拉、灌浆技术 ;超长混凝土外环梁(781m)的预应力技术及后浇带施工技术 ;屋盖预应力斜拉索的成套施工技术等。
This paper introduces the vertical prestressing and grouting technology of the concrete tower in the main stadium structure of Huanglong Sports Center in Zhejiang Province, the prestressing technology and post-pouring zone construction technology of the extra-long concrete outer ring beam (781m) Cable sets of construction techniques.