论文部分内容阅读
一、问题的提出提高电站出力的全国性会议于12月3号在石景山现场举行,模式口水电站是提高水力发电的一个试点,它担负着此次会议提高水电出力的技术性资料的提供任务,这是在全国工农业大跃进的形式下,提高电力“先行官”实力的一项具有重大意义的工作。模式口电站的设计装机容量为6,000瓦(两台机组,各3,000瓦),为挖掘潜力拟将发电量提高到7,700瓦,即提高原设计的28.4%,这一经验若能在全国推广,将有重大的经济意义。水电站提高出力最耽心的问题是:电力系统上发生事故,骤然跳闸(弃荷),水轮机
First, the issue put forward to raise power output of the national conference was held on December 3 at Shijingshan site, mode of hydropower station is to improve hydroelectric power a pilot, it is responsible for the meeting to improve the output of hydropower technical information to provide the task, which It is a work of great significance in raising the strength of “leading officials” of power in the form of a great leap forward in agriculture and industry nationwide. With a design capacity of 6,000 watts (two units, 3,000 watts each), the proposed port power station intends to raise the generating capacity to 7,700 watts in order to tap the potential, which means 28.4% of the original design will be upgraded. If this experience can be promoted across the country, There is significant economic significance. The most worrying issue for hydropower stations to increase their output is the accident on power system, sudden tripping (abandoned load), water turbine