横县飞洒坝是一座填碴重力坝,拦截郁江小支流长滩江,坝址集雨面积296平方公里,多年平均降雨量1,300毫米,最大坝高29.5米,坝顶长190米,坝顶宽3米,长80米,地质为浅红色砂岩和页岩互层,砂岩层厚约1米,页岩层厚0.1~0.15米。枢纽工程按 SDJ_(12)——78的要求,采用100年一遇洪水设计,500年一遇洪水校核,总库容1,375万立方米,有效库容196万立方米,正常高水位83.5米,死水位79.0米。建坝的目的是供电灌抽水。电灌装机3台共计345千瓦,提水流量0.45立方米/秒,结合发电装机4台,单机200千瓦,总容量800千瓦,正常年发电量450万度。还设置了拦鱼栅及进鱼池等附属设施,作为工程付业。飞洒坝工程实际土方
Hengxian fly spill dam is a ballast gravel dam, blocking the tributary of the Longjiang River Yujiang small dam site rainfall area of 296 square kilometers, the average annual rainfall of 1300 mm, the maximum dam height of 29.5 meters, the crest length of 190 meters, the crest width 3 meters long and 80 meters long. The geological layer is interbedded with light red sandstone and shale. The sandstone layer is about 1 meter thick and the shale thickness is 0.1-0.15 meters. According to the requirements of SDJ_ (12) - 78, the pivotal project adopts 100-year flood design and 500-year flood check, with a total storage capacity of 13.75 million cubic meters, an effective storage capacity of 1.96 million cubic meters and a normal high water level of 83.5 meters The water level is 79.0 meters. The purpose of the dam is to supply pumping water. Three electric filling machines total 345 kilowatts, lifting water flow of 0.45 cubic meters / second, combined with power generation installed 4 sets, single 200 kilowatts, with a total capacity of 800 kilowatts, the normal annual generating capacity of 4.5 million degrees. Also set up a fish barrage and into the fish pond and other ancillary facilities, as a project to pay. Fly sprinkler dam actual earthwork