论文部分内容阅读
重点讲解了国电太原第一热电厂现有翻车机的运行方式及存在的安全隐患,为达到降低系统运行故障率,提高系统综合卸车能力的目的,根据现有翻车机的运行状况对翻车机系统进行改造,即翻车机本体进行全部更换,并按采用“C型”翻车机进行方案论证,且对改造后设备的状况进行了分析。
In order to reduce the system operation failure rate and improve the overall unloading capacity of the system, the paper explains the operation mode and the potential safety hazard of the existing dumper in the first power plant of Guodian Taiyuan Power Plant. According to the operation status of the existing dumper, Renovation, that is, all the replacement of the dumper body, according to the use of “C-type” dumper for demonstration of the program, and the status of the equipment after the transformation was analyzed.