1核准理论线损,提供降损依据。首先,要分线、分电压、分台区进行理论线损计算,同时,要规范抄表周期,确保供售电量同期统计与核算,还可推行交叉管理法。即:成立若干线损管理小组,交叉管理有关综合线路,也就是说管理某条综合线路的人员,原则上不要负责与该条线路相连
1 Approval of theoretical line loss, providing basis for loss reduction. First of all, it is necessary to calculate the theoretical line loss of sub-line, sub-voltage, and sub-zones. At the same time, it is necessary to standardize the meter reading cycle, ensure the statistics and calculation of electricity supply for the same period, and promote cross-management. That is, a number of line loss management teams are established to cross-administer the relevant integrated lines. In other words, the personnel who manage an integrated line should not be responsible for connecting with the line in principle.