论文部分内容阅读
宁都县高低岭电站,水头120米,装机800千瓦。一九七二年冬动工,一九七四年投产。电站的主要建筑物是二条直径50厘米的引水压力管。要建设承受这么大水头的引水管,过去按常规必须用钢管。需投资10万元,8毫米厚的钢板70吨。这样多的投资和钢材,在当时对我们来说是无法解决的。当我们了解到用予应力混凝土管可以代替钢管这一技术情报后,就积极引进这一新技术。 Ningdu County High Ridge Power Station, head 120 meters, installed capacity of 800 kilowatts. Construction started in the winter of 1972 and commenced production in 1974. The main building of the power station is two water-carrying pressure pipes with a diameter of 50 cm. To be able to withstand such a big head of the diversion pipe, in the past must use conventional steel pipe. Need to invest 100,000 yuan, 70 tons of steel plate 8 mm thick. Such a lot of investment and steel could not be solved for us at that time. When we learned that the use of prestressed concrete pipe can replace the technical information of the pipe, it is actively introducing this new technology.
其他文献
日本国家空间开发厅(NASDA)开发出三种航天飞机外部零件用的耐热材料。日本航天飞机是根据HOPE H-Ⅱ轨道运行项目开发的。该项目旨在于用日本的技术于90年代中期生产出航天
我校是以培养基础教育人才为主的师范院校。通过对我校艺术展示现状而进行的调查研究中发现,在较为新兴的舞台表演方面还有诸多不完善、成熟之处。通过一系列相关调查分析研
本文总结了我省近几年来在预应力混凝土管设计计算、制造安装、测试技术方面的做法和经验,供读者参考. This article summarizes the province in recent years in prestres
土石坝坝体在填筑前,必须先将坝面与地基面的交线测放出来,以确定清理范围.坝面一般都由几个不同的平面组合而成,而地基面却往往是不规则的曲面,因此,它们的交线也是一条不
本文利用Rb-Sr法计时原理,分析测定了贵州烂泥沟大型卡林型金矿床不同成矿阶段的石英流体包裹体与方解石脉矿物的Rb、Sr同位素组成,获得一条线性较好的Rb-Sr等时线,其年龄值为105.6
发电厂变电所中有的母线每相由四片同样规格的矩形铝排并联,断面排列成正方形的,称为盒形母线。施工中对于90°弯曲通常采用在弯曲处拼焊的方法,为了得到准确的90°弯角,必
本文从二维急流的基本方程出发,证明了在F_(ro)■1时急流存在一个极限状态。并为大弗氏数下的急流试验确立了自动相似律。 In this paper, starting from the basic equatio
能源是国民经济和人民生活中主要的物质基础,是整个社会主义经济发展的先行官.因此,对能源的选择、开发和合理利用,就成为我们进行四个现代化建设必须解决的极为重要的问题.
在工程建设测量中,断面测量是一项频繁而艰苦的工作,峭壁的断面测量更是断面测量中的难点.根据龙羊峡地区地形的特点,采用地面立体摄影的方法,在立体坐标量测仪上进行峭壁的
不用钻爆法而直接用机械来开挖岩石,这是多年来一直在探索的课题。近年,由于大功率施工机械和液压技术的飞速发展,用机械法直接开挖岩石已经在隧洞掘进、岩层剥离等工程中得