宁都县高低岭电站,水头120米,装机800千瓦。一九七二年冬动工,一九七四年投产。电站的主要建筑物是二条直径50厘米的引水压力管。要建设承受这么大水头的引水管,过去按常规必须用钢管。需投资10万元,8毫米厚的钢板70吨。这样多的投资和钢材,在当时对我们来说是无法解决的。当我们了解到用予应力混凝土管可以代替钢管这一技术情报后,就积极引进这一新技术。
Ningdu County High Ridge Power Station, head 120 meters, installed capacity of 800 kilowatts. Construction started in the winter of 1972 and commenced production in 1974. The main building of the power station is two water-carrying pressure pipes with a diameter of 50 cm. To be able to withstand such a big head of the diversion pipe, in the past must use conventional steel pipe. Need to invest 100,000 yuan, 70 tons of steel plate 8 mm thick. Such a lot of investment and steel could not be solved for us at that time. When we learned that the use of prestressed concrete pipe can replace the technical information of the pipe, it is actively introducing this new technology.