水泥稳定类路面基层材料的延迟成型

来源 :公路 | 被引量 : 0次 | 上传用户:wmrik
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
研制一种超效缓凝剂 SRA,当掺量为 0 .0 4 5 %时可将终凝时间延长到 10 h;综合考察 SRA对水稳粒料的强度和对水泥凝结时间的影响确定 SRA的最佳掺量在 0 .0 5 %~ 0 .0 6 % ,用 SRA可大大延长延迟成型时间 ,可把延迟成型时间延长到 8~ 9h。在延迟成型时间较长时 ,SRA起到的缓凝作用比木钙更明显。在模拟施工条件下延迟 4 h、6 h后的 SRA改性水泥稳定粒料强度损失明显小于同种混合料在延迟成型条件下的强度损失 An SRA with super-setting retarder was developed. The final setting time could be prolonged to 10 h when the dosage was 0. 04 5%. The effect of SRA on the strength of water-stable aggregate and its effect on the setting time of cement was investigated. The best dosage is in the range of 0. 05% ~ 0. 06%. Using SRA can greatly prolong the delay molding time and extend the delay molding time to 8 ~ 9 hours. SRA played the role of retarding effect more obviously than that of wood calcium when the delay molding time was longer. The strength loss of SRA-modified cement stabilized pellets after delayed 4 h and 6 h under the simulated construction conditions was significantly less than that of the same mixture under the delayed forming conditions
其他文献
"质量方面的法律法规、技术标准更新较快,许可证年审、换证时,企业不知如何准备,希望帮助培训一下技术人员"。在山东省菏泽市牡丹区召开的质监部门服务企业发展联席会上,加强质
加强军校研究生人文素质教育,既是研究生个人全面发展的需要,也是军队现代化建设的时代要求。切实提高军校研究生人文素质,需要树立科学教育和人文教育相互融合相互补充的现
进入3月份,北半球的发达国家先后忙了起来。北美洲的美国、加拿大,从第二个周日起,把时钟拨快1小时,一直要延续到11月的第一个周日,再把时钟拨回来,长达8个月。2011年3月27日
接上期二、2012年国土资源管理主要工作安排2012年是全省实施“十二五”规划承上启下的重要一年。做好全年国土资源管理工作,对保障全省经济社会发展良好势头具有重要意义。
城乡建设用地增减挂钩是指依据土地利用总体规划,将若干拟复垦为耕地的农村建设用地地块(即拆旧地块)和拟用于城镇建设的地块(即建新地块)等面积共同组成建新拆旧项目区,通过建新拆
在大多数人眼里,“安全工作”总是与“硬规定”、“铁手腕”等带冷冰冰、硬邦邦的冷色调的词语联系在一起。然而近日发生在笔者身边的一件事,让我看到了“抓安全”和“管人心
目的:用腺病毒载体将人骨形态发生蛋白-2(BMP-2)基因导入兔骨髓基质干细胞(BMSCs),种植PLA/PCL(聚乳酸/聚己内酯)支架体外构建组织工程骨.方法:蛋白印迹法检测转染后细胞BMP-
国防工业进入和退出的制度性障碍表现为潜规则障碍、正式规则障碍和实施机制带来的障碍.通过转变国防工业政府管理部门的职能、加强国防工业领域的行业法律法规制度建设、推
新中国成立初期,人民解放军展开了学苏军活动。这次学苏军活动,经历了全面学习、有分析有批判地学习以及确立“以我为主”方针等三个历史阶段。通过学习、借鉴苏军经验,人民
本文在明确信息资源内涵的基础上,对目前在信息资源测量中采用较多的信息资源丰裕度系数测度模型进行评析,并对该模型的指标体系和具体算法作出了改进,以期进一步完善。 On