1 Operating time and released energy In 2003, the reactor operated safely for 4 786 h and the energy released was 1 390.85 MW·d,operating power level was 6500
1 《Journal of Beijing Electronic Science and Technology Institute》, Vol.11, 20031) Chaotic cryptography based on feistel structure, No. 1, p. 13. Zhao Geng (
The technology of radiation imaging plays an important role in the area of no-bug diagnosis. Theprinciple is that the absorbed dose amount is different when ra