中条山有色金属集团公司铜矿峪矿混合提升井担负着坑下690,530,410和330水平人员、材料和废石的提升。在530中段建设初期,混合提升井是通往该中段的唯一通道,由于建设滞后,中段生产衔接紧迫,提升任务繁重。原混合提升井双层罐笼在690中段和530中段提升人员时,由于不能同时进出罐笼,必须对罐2次,占用的提升时间较长,提升效率较低,为此改造井口设施,变2次对罐为1次,充分挖掘了设备设施潜力,生产矛盾得到缓解。
Zhongtianshan Nonferrous Metals Corporation Copper Mine Yuliang mixed lift wells responsible for the 690,530,410 and 330 under the level of personnel, materials and waste rock upgrade. In the early stage of construction of the middle section of 530, the mixed lift shaft was the only access to the middle section. Due to the lagged construction, the middle-level production was in a tight juncture and the task of upgrading was heavy. In the middle of 690 and mid-530, when upgrading two-tier cage of the original hybrid lift shaft, the tank can not be moved in and out of the cage at the same time, and the tank must be used twice, which takes a long time to lift and has low efficiency. Therefore, The tank is 1, fully tap the potential of equipment and facilities, production contradictions have been eased.