该文根据1004综采工作面下延对接工程,从工作面对接准备、对接方案的制订、对接方案的实施等方面进行详细阐述,针对对接过程出现的问题进行总结分析,实践出行之有效的控制措施,实现了矿井安全生产及产量的稳定。
Based on the 1004 fully mechanized mining face docking project, this article elaborates in detail the preparation of the face preparation, the establishment of the docking scheme and the implementation of the docking scheme. The problems in the docking process are summarized and analyzed, Control measures to achieve the mine safety production and the stability of output.