焦页17-3HF井第一口井钻至816.15m出现放空,发生溢流,节流循环压井过程中发生井漏,多次堵漏压井及排水证实井下存在气水同层,亦为喷漏同层且含H2S,目前不具备继续下步施工的条件。平移至第二口井后,利用旋转防喷器强钻至漏层以下层位,下套管进行封隔,克服了这一难题。本文重点介绍了第二口井钻遇溢流后的处置过程,为后续井碰到类似情况提供借鉴和参考。
Jiao page 17-3HF well drilled to 816.15m vent, overflow, throttling circulation well killing process occurred during the well, multiple plugging kill and drainage to confirm the presence of gas and water underground, also Spurting with the same layer and containing H2S, currently do not have the conditions to continue the next construction. After translating to the second well, the rotary blowout preventer is used to drill to the layer below the leakage layer to seal the casing, which overcomes this problem. This article focuses on the disposal of the second well after it encounters overflow and provides reference and reference for similar situations encountered by subsequent wells.