广东省电力一局万益钢结构厂设计、改造的钢结构件加工设备以及制定的工艺措施,对珠海电厂一期2×660 M W 机组的整套钢结构件进行了加工。结果表明,与以往的工艺比较,整套钢结构件的生产效率可提高30 % ,并且加工质量可以得到有效的控制。实践证明,它具有实际的应用价值,可供今后钢结构加工借鉴
The steel structure processing equipment designed and transformed by the Wanyi Steel Structure Plant of the Guangdong Provincial Electric Power Bureau Wanyi Steel Structure Plant and the formulated technical measures were used to process the complete steel structure of the 2×660MW W unit of Zhuhai Power Plant Phase I. The results show that compared with the previous process, the production efficiency of the complete steel structure parts can be increased by 30%, and the processing quality can be effectively controlled. Practice has proved that it has practical application value and can be used for reference in future steel structure processing.