把握生态建设相持阶段规律搞好新时期三北工程建设--关于"十一五"三北防护林工程建设的思考和建议

来源 :绿色中国 | 被引量 : 0次 | 上传用户:yzqp178
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
整个三北工程分3个阶段,8期工程,需73年完成,目前工程已实施了近30年。需要对三北工程地位进行再认识,并注意工程的协调发展、总结继承与开拓创新、工程建设的机制创新、科技支撑作用的发挥和生态产业的发展等问题。用可持续发展的思想和科学的发展观分析了未来一个时期的工作思路,并提出了相应建议。 The Three North Project is divided into three stages, eight projects, 73 years to complete, the project has been implemented for nearly 30 years. We need to re-understand the status of the Three North Project, and pay attention to the coordinated development of the project, summarize the succession and pioneering and innovative construction of the mechanism innovation, science and technology play a supporting role and the development of eco-industries and other issues. With the thought of sustainable development and the scientific outlook on development, the work train of thought in the coming period is analyzed and the corresponding suggestions are put forward.
其他文献
以大田栽培的“赤霞珠”酿造葡萄为试材,进行了3种不同模式的生泰透气防渗砂实验.结果 表明,栽植沟底覆膜时使用生泰透气防渗砂能提高酿造葡萄成活率约1%,提高新梢平均生长量2
行业整合走进窗口期rn2016年,集装箱航运业发生了5宗并购案(达飞轮船收购美国总统轮船、中远集运和中海集运合并、赫伯罗特和阿拉伯轮船合并、三家日本公司的集装箱业务合并
期刊
本刊讯日前,据商务部消息,巴基斯坦将对原产于中国等地的涂布和未涂布书写印刷纸(不含浸渍纸)进行反倾销立案调查。据了解,巴方曾于2010年12月对铜版纸发起反倾销调查,后因申
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
本刊讯2011年11月4日,美国国际贸易委员会发布公告称,对原产于中国、印度和印度尼西亚的格记录纸进行全面反倾销日落复审产业损害调查,并对原产于印度和印度尼西亚的格记录纸
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥