白水峪工程采用新型消能工后,在泄洪消能建筑物未完建的情况下,既要施工、又要度汛、还要发电。通过模型试验,对在汛期泄洪出现的各种工况进行模拟检验,以采取相应的措施,做到有备无患。
Baishuiyu project using a new energy dissipater, in the flood discharge energy-saving buildings unfinished case, it is necessary to construction, but also flood, but also power generation. Through the model test, various conditions of flood discharge in flood season were simulated and tested to take appropriate measures to be prepared.