工程变更是指合同实施过程中由于各种原因所引起的设计变更、合同变更。榆神工业区清水工业园供水工程在实施过程中,由于征地、地质勘察、设备采购、施工不按图施工等各种原因导致工程变更的发生,工程变更的发生或多或少会引起投资的增加,甚至会影响工期。加强设计变更管理是水利水电工程建设中控制投资、工期、质量的有效途径。
Project change refers to the design changes and contract changes caused by various reasons during the contract implementation. During the implementation of the water supply project of Yinshen Industrial Park in Qingshui Industrial Park, due to various reasons such as land acquisition, geological prospecting, equipment procurement and construction not according to construction, engineering changes will occur and the change of project will cause more or less investment Increase, or even affect the duration. Strengthening design change management is an effective way to control investment, duration and quality in water conservancy and hydropower projects.