近一段时间以来,有关特高压输电通道获得核准或开工的消息一个接着一个,而与这些输电通道配套建设的电源基地如何布局却仍然云里雾里。应该同期建设的电源基地已经滞后,而更严重的是有关电源基地规划布局的认识尚不统一,几年来已经具有较高共识的风火打捆方式方法又有犹疑,这着实令关心可再生能源发展的人们有些不安。风火打捆是以风电与火电的打捆运行,并经输电通道实现电力外送的运用方式。这种方式可以在满足跨区域送电和建设坚强电网的同时,还可以加大风电等可再生能源的利用开发,
Recently, the news on whether UHV power transmission lines have been approved or started is one after another. However, the layout of the power bases that are paired with these transmission channels is still in the fog. The power base that should be constructed over the same period has lagged behind. What is even more serious is that the understanding on the planning and layout of power bases is not uniform. There has been some hesitation on the method of bundling wind and fire with a few years of high consensus. This has indeed caused concern for the development of renewable energy Some people are upset. Wind Fire Baling is a wind power and thermal power bundled run, and through the power transmission channels to achieve the use of electricity delivery. This approach can meet the cross-regional power transmission and construction of a strong grid at the same time, but also can increase the use of wind power and other renewable energy development,