我公司1983年接受了湛江首站9号和10号两台50,000m~3浮顶油罐的施工任务。这两台油罐均采用日本钢材,顶上两圈为SM41B,油罐底板和其余部分均为SPV32,每圈板的高度为1580mm,现将我们在施工中的一些主要作法介绍如下: 一、底板的安装 1.排板形式的选择根据我们及兄弟单位施工的经验,我们分析了以前通用的几种排板形式:(1)条形排板;(2)丁字形排板;(3)人字形排板;(4)“分块”排板。普遍认为后两种排板形式较好,可避免某一方面的焊缝集中,使收缩较为均匀。比较起来:分块排板法会增加一些焊缝,且焊接顾序尚无一致意见;而人字形排板法会形成两条贯穿焊缝,
In 1983, our company accepted the construction tasks of two 50,000m ~ 3 floating roof oil tanks on No.9 and 10 of Zhanjiang first station. The two tanks are made of Japanese steel, SM41B top two rounds, SPV32 bottom of the tank and the rest of the plate height of 1580mm, now we are in the construction of some of the main practices are as follows: First, Bottom plate installation 1. The choice of row plate form According to our experience and brothers unit construction, we have analyzed several common before the row plate form: (1) strip plate; (2) T-shaped plate; (3) Herringbone row plate; (4) “block” row plate. It is generally believed that the latter two types of row plates are better, which can avoid the weld concentration on one side and the more uniform contraction. In comparison: the sub-block row method will increase the number of welds, and there is no consensus welding sequence; and herringbone plate forming law will form two through the weld,