运用综合评价方法对电网建设项目中的其他费用特征值进行分析,选取费用结构占比、决概算差异率、发生频率作为评价指标,采用熵权法确定指标权重,筛选重点管控费用,并提出费用管控方向。
The comprehensive evaluation method is used to analyze the characteristic value of other expenses in the power grid construction project. The proportion of expense structure, the discrepancy rate of decision settlement and the occurrence frequency are taken as the evaluation indexes. The entropy weight method is used to determine the index weight, and the key control costs are screened out. Control direction.