以大唐内蒙古托克托电厂改造过程中输煤栈桥的吊装为研究对象,介绍了该栈桥吊装条件,针对吊装环境狭窄,施工场地小的特点,采用了推演式的方案设计和精细化的施工过程控制,对在大面积阻塞滤波器场的影响下如何进行大型构件抬吊等难点进行了分析研究,提出了解决方案,经工程应用验证,吊装受控,设备安全就位,成本低,工期短,经济性好。
Taking Datang Inner Mongolia Tuoketuo Power Plant retrofit process as the research object, this paper introduces the hoisting condition of this trestle bridge. In view of the characteristics of narrow lifting environment and small construction site, it adopts the program design and elaborate construction Process control, analysis and research on how to lift large components under the influence of large-scale blocking filter field, and put forward the solution, verified by engineering application, controlled by lifting, equipment safety in place, low cost, Short, good economy.