论文部分内容阅读
文章结合广深港高速铁路客运专线楼村2#特大桥悬浇箱梁施工,简要介绍了预应力施工工艺流程,重点阐述了重要施工环节的控制技术要点。
In this paper, the construction process of prestressed construction is briefly introduced in combination with the construction of the cantilevered box girder of 2 # special bridge in Guangzhou-Shenzhen-Shenzhen high-speed railway passenger line. The key points of the control technology of the important construction links are mainly described.