一、概述岩滩水电站为目前广西在建的最大水电站,装机容量121万瓩,施工导流采用左岸开挖大明渠右边设导流墙,穿经主体工程部份从#19~23坝段做成八个4×10米底孔,顶板高程163米,其右导墙为#18坝段,即5×8泄水底孔及泄水槽,并和左右两侧部份溢洪孔组成宽26.5米坝段。
I. Overview The Yantan Hydropower Station is currently the largest hydropower station under construction in Guangxi with an installed capacity of 1.12 million tons. The construction diversion adopts the diversion wall on the right side of the Daming Drainage Project on the left bank to pass through the main part of the project to make dam sections from # 19 to 23 Into eight 4 × 10 meters bottom hole, the roof elevation of 163 meters, the right guide wall for the # 18 dam section, that is, 5 × 8 drain bottom hole and drain tank, and the left and right sides of the spillway composed of 26.5 meters wide Dam section.