论文部分内容阅读
柳州发电有限责任公司的前身为柳州发电厂,共装有两台20万千瓦燃煤机组。自1、2号机相继于1994、1995年投产以来,累计发电约110亿千瓦时,为广西的电力事业作出了巨大的贡献。但由于种种原因,机组设计相对落后,设备效率低,厂用电率及能耗偏高,跑、冒、滴、漏严重,操作
The predecessor of Liuzhou Power Generation Co., Ltd. is the Liuzhou Power Plant, which is equipped with two 200,000 kilowatts of coal-fired generating units. Since the No. 1 and No. 2 machines were put into production in 1994 and 1995, the cumulative power generation was about 11 billion kilowatt-hours, which has made tremendous contributions to Guangxi’s electric power industry. However, due to various reasons, the unit design is relatively backward, the equipment efficiency is low, the plant electricity consumption rate and energy consumption are high, and the running, running, dripping, and leaking are serious.