1958年11月中旬在冶金工业部组织下,清华大学与石景山钢铁厂合作,并在第一机械工业部机械制造与工艺科学研究院及冶金工业部冶金建筑科学研究院参加下,成功地完成厂用板极电渣焊焊接800軌梁轧钢机机架的工作。这項工作,无論就其所焊接的断面大小,工作組織的規模,或試驗的份量来說,都是国內空前的,它是我国焊接工作发展中值得庆幸的一件大事。应該特別指出,在这項工作中,苏联专家志同多次亲临現場指导,对工作給了很大的帮助。 800軌梁軋鋼机机架由25铸鋼组成,每个重
In mid-November 1958, under the organization of the Ministry of Metallurgical Industry, Tsinghua University cooperated with Shijingshan Iron & Steel Works and successfully completed the project with the participation of the Institute of Machinery Manufacturing and Process Science of the First Machinery Industry Ministry and the Metallurgical Building Research Institute of the Ministry of Metallurgical Industry Electrode welding with plate pole 800 track beam rolling mill machine work. This work, regardless of the size of its welded section, the size of the work organization or the amount of testing, is unprecedented in the country. It is a fortunate event in the development of welding in our country. It should be specially pointed out that in this work, Soviet experts volunteered to visit the site for many times and gave great help to their work. 800 rail beam rolling mill machine frame consists of 25 cast steel, each weight