工程概算与工程造价髓有联系又有区别。二者所处的工程建设阶段不同、外部条件不同、编制方法不同,差异是客观存在的。如果认为控制住了工程概算就控制住了工程造价是不全面的。控制工程造价的关键阶段是建设(施工)阶段,但这个阶段还比较薄弱。要进一步深化改革,规范投资管理,理顺各方关系,才能有效控制工程造价
Engineering estimates and engineering costs of the marrow there are differences between the marrow. The two projects are in different stages of construction, external conditions are different, the preparation of different methods, the difference is an objective reality. If you think that control of the project budget to control the project cost is not comprehensive. The key stage to control the construction cost is the construction (construction) stage, but this stage is still relatively weak. To further deepen the reform, standardize investment management, straighten out the relationship between all parties, can effectively control the project cost