对工程施工环节进行控制,是确保工程按时、按质、按量完成的基础。在分析滁河一级站节制闸除险加固工程概况、任务及工程特点的基础上,对施工过程中的进度、质量、投资及安全生产环节进行了分解,制定了相应的控制措施。工程完工后的试运行结果显示,除险加固效果良好。通过制定的各项过程措施,有利地保证了主体工程的按期完成,工程质量可靠,总造价处于预算范围内,整个施工期间无安全事故,对其它类似水利工程的除险加固具有一定的参考意义。
Control of construction links, is to ensure that the project on time, according to the quality, the basis of the amount completed. Based on the analysis of the general situation, tasks and engineering features of the project of strengthening and eliminating the control gates of Chuhe first grade station, the progress, quality, investment and safety in the construction process are decomposed and the corresponding control measures are formulated. After the completion of the project commissioning results show that the reinforcement of the effect of good. Through the process of the development of measures to ensure that the main project on schedule to complete, the project quality and reliable, the total cost is within the budget, the entire construction period without safety accidents, and other similar water conservancy project reinforcement with a certain reference value .