南垭河三级水电站1982年底第一台机组投产,1983年全部竣工并网发电,通过两年多运行考验,于1986年4月经水电部委托西南电管局会同省建委等正式验收,现已运行五年多,电气一次设备运行正常,且使电站投入运行就达到设计出力,每年都超额完成发电计划。 设计中要求全部电气设备经过耐压试验,正确合理选择合格产品,是成功的主要原因。
The first unit at the end of 1982 was put into operation at Nanyya River III Hydropower Station and all the grid-connected power generation was completed in 1983 and passed the test for more than two years. In April 1986, the Southwest Electricity Administration entrusted the Ministry of Water Resources together with the Provincial Construction Committee and other formal acceptance. After more than five years of operation, the primary electrical equipment is in normal operation and the power plant is put into operation to achieve the designed output, and the power generation plan is overfulfilled each year. Design requirements for all electrical equipment after voltage test, the correct choice of qualified products, is the main reason for success.