四川省寸塘口电站通过竣工验收1995年10月20~21日,由四川省水电厅组成的寸塘口电站竣工验收委员会,在电站现场通过听取汇报、查看运行实况、审阅资料等,认为初设标准的工程内容全部建成且运行正常,符合SDJ275—88规定标准,予以通过全面竣工验收,...
Sichuan Tongtukou Power Station Passed Completion and Acceptance Completed Acceptance Commission for the completion of the Tongtangkou Hydropower Station, which is composed of the Sichuan Provincial Hydropower Department from October 20 to October 21, 1995. At the station’s site, by listening to the reports, checking the actual operation and reviewing the data, Let all the standard project content built and operating normally, in line with the SDJ275-88 standards, to be fully completed acceptance, ...