根据《水电工程可行性研究报告编制规程》的相关规定,并结合白鹤滩水电站设计要求,研究了白鹤滩水电站施工期施工设备选型及其配套、施工技术及工艺选择、施工辅助生产系统及其施工工厂设计中涉及的节能技术及措施。依据水电工程具有的普遍适应性,对水电站施工期可采取的节能技术及措施的研究思路及方法进行了探讨,为研究类似水电工程的节能技术及措施提供了借鉴与参考。
According to the relevant provisions of “Rules for Compiling the Hydropower Engineering Feasibility Study Report” and combining with the design requirements of Baihetan Hydropower Station, this paper studies the selection of construction equipment and its matching facilities, construction technology and process selection, construction auxiliary production system Energy-saving technologies and measures involved in the design of construction factories. Based on the general adaptability of hydropower projects, the research ideas and methods of energy-saving technologies and measures that can be taken during the construction of hydropower stations are discussed, which provides reference and reference for the study of energy-saving technologies and measures for similar hydropower projects.