鉴于滑坡有限元分析过程存在的“瓶颈”问题——前后处理部分占整个系统分析中所消耗的时间的比例超过90%,应用高级语言与AutoCAD的接口,有效地解决了CAD图形与滑坡数据和计算结果数据图形化的矛盾。针对清江水布垭水利枢纽台子上滑坡,进行了滑坡前处理和后处理方法的介绍,总结了滑坡有限元数值计算前后处理的一般方法和过程,对其它滑坡的稳定分析过程也有很好的借鉴作用。
In view of the “bottleneck” problem of landslide finite element analysis process - the proportion of preprocessing and postprocessing in the total system analysis accounts for more than 90% of the time, the application of high-level language and AutoCAD interface effectively solve the CAD graphics and landslide Graphical contradictions between data and calculated data. Aiming at the landslide at Taizi of Shuibuya Water Conservancy Project in Qingjiang River, the methods of pre-treatment and post-treatment of landslides are introduced, and the general methods and processes of landslide numerical calculation before and after treatment are summarized. The stability analysis process of other landslides is also well referenced effect.