河北省水利厅学习了农电司(85)农电水字第45号文以后,为了加强小水电的建设管理,决定采取以下措施: -,严格建设程序。所有水电工程不论使用何种资金,均按基建工程管理。批准初步设计后方能列入年度计划,批准开工报告后始能动工兴建,未经批准的工程一律不准动工。工程施工、安装必须按设计文件进行,工程竣工之后由设计审批部门组织竣工验收,验收合格后再交付生产。二,加强设计管理。具有水电专业设计许可证书的专业设计单位方能承担500千瓦以上水电站的设计。设计要安全可靠,运用方便,技术先进,经济合理,效益显著,设计文件要符合省《小型水电站初步设计编制暂行规定》的要求,设计文件不准自编自校,计算书、图纸要逐级审查。设计、校核、审查、核定人员要分别签字,未签字的文件和图纸不得上报,无签字批准的文件不准施工。
Hebei Provincial Department of Water Resources learned from the Rural Electric Power Department (85) Rural Water Word No. 45, in order to strengthen the construction and management of small hydropower, decided to take the following measures: -, strict construction procedures. All hydropower projects no matter what kind of funds are used, according to infrastructure projects management. After approval of the preliminary design can only be included in the annual plan, approved the commencement of construction after the commencement of construction, unauthorized projects are not allowed to start. Construction, installation must be carried out according to the design documents, after the completion of the project by the design and approval department for completion and acceptance, acceptance after passing the production. Second, to strengthen the design management. Hydropower professional design permit certificate of professional design unit can afford 500 kilowatts hydropower station design. Design to be safe and reliable, easy to use, advanced technology, economic and reasonable, significant benefits, the design documents to meet the provincial “preliminary design of small hydropower stations Interim Provisions,” the requirements of the design documents are not allowed to self school, calculations, drawings to be level Review. Design, check, review, verification staff to be signed, unsigned documents and drawings shall not be reported, without the approval of the construction of documents without approval.