摘要:市政排水系统施工具有特殊性,其工作系统的大部分管网也是埋在地下的,一旦出现问题将会影响生产装置正常生产,甚至造成火灾、爆炸事故,而且发现问题与解决问题需要较长的时间,因此,给排水工程在施工过程中,管理是十分重要的。结合多年的实际工作经验,就如何提高市政给排水工程的施工管理,从准备阶段、施工阶段、竣工验收阶段三个阶段进行了讨论,仅供相关工作人员参考。
关键词:质量控制、 竣工验收、 闭水试验
Abstract: with the particularity of the construction of municipal drainage system, most network work system is buried in the ground, once the problem will affect the production unit normal production, or even cause fire, explosion, and find and solve the problems requires a longer time, therefore, water supply and drainage engineering in the construction process, management is very important the. With many years of practical experience, on how to improve the urban construction management on drainage engineering, from the preparation stage, construction stage, completion and acceptance of three stages are discussed, the only relevant staff.
Keywords: quality control, completion and acceptance, closed water test
中图分类号:TL353+.2文献标识码:A 文章编号:2095-2104(2013)
城市排水管道系统是现代化城市不可缺少的重要城市市政基础设施,也是城市水污染防治和城市排涝、防洪的骨干工程,它的任务是及时收集,输送城市产生的生活污水、工业废水和降水。其作用是及时可靠地排除城市区域内产生的生活污水,工业废水和降水,使城市免受污水之害和免受暴雨积水之灾,从而给人们创造一个舒适安全的生存和生产环境,使城市生态系统的能量流动和物质循环正常进行,维持生态平衡,保证可持续发展。
一、市政给排水工程施工准备工作
根据总体工程的施工原则,首先安排水工程开工,其目的是完成水通和场地平整,并使排水系统及早具备排水能力,为施工现场的防洪、排涝发挥作用,为主体工程施工创造条件。根据工程总体安排,应注意:
1、每条给水管线应在其服务的工号或装配试车之前完工,可根据城市规划道路的施工工期要求施工。
2、排水系统优先安排,其施工顺序为:排水泵房一排水主管线一排水支管线。
3、凡是与混凝土水池相连接的各类管道,必须等待混凝土水池试水沉降合格后,再相互连接密封。
4、编制质量计划
总承包单位质量管理部门依国家、行业有关规范和设计文件,结合本行业与本单位以往给排水工程已取得的成功经验和教训,编制给排水工程质量计划,确定施工期间的检验程序;质量控制及控制点等级;质量检验方式与方法;质量检验方式与方法;质量检验记录与质量检验报告的填写、传递、存档方法;质量事故处理制度。
5、给水工程施工管理工作应遵照国家规范,保证工期和质量完成给水管道工程的施工任务、熟悉图纸,开工前首先必须了解图纸、同甲方、监理方进行三方图纸交底;二要结合图纸深入施工现场了解本工程的基本全貌,如管线总长度、管线走向、管径、阀门井数量等,还有与工作面开挖有关地形、地貌、地物等;三是依照图纸确定的桩号走向水准测量复测一遍,避免出错。因为图纸设计前所提供地形资料存在时间预算造价问题,对此千万不可忽视。
6、编制施工组织设计总承包单位组织各施工单位有关人员勘察施工现场,依据有关工程施工规范和设计文件,编制施工组织设计。总承包单位编制给排水工程总体施工组织设计,各施工单位应有完善的给排水施工组织设计并符合排水工程体施工组织设计相应的条文。
二、市政给排水工程管道施工阶段的准备要点
1、设计图纸,施工单位在接到施工任务后,第一步需要按照施工区域的实际情况以及施工要求来设计图纸。设计图纸必须先做好调查研究,摸清地层和地下水的情况,并根据排水需要,选定排水结构的类型、位置、埋深、构造与尺寸等,为了保证施工质量施工方对这些数据的准确性要求非常严格。
2、熟悉图纸,无论对任何工程进行施工,熟悉图纸都是至关重要的第一步。对于市政排水管道工程来说,施工人员只有熟悉了图纸,结合图纸掌握了排水管线的长度、坡度、走向、管材直径、 井位数以及与施工区域有关的地形、地貌、地物等情况,才能在施工过程中有条不紊地应对一切突发事件。
3、根据给排水管道工程特点、 設计要求、 规范规定和承包人中报的施工组织设计 (包括施工工艺,施工方案、组织措施以及准备工作,各类进场技术人员,工种、材料和机具设备检验结果情况及现场施工条件等因素),将编制好的施工组织或施工方案经单位技术负责人审批后,填写施工组织专业设计报审表提交工程部、质监站和监理部会审。
4、对进场的材料,成品的质量进行严格的控制,认真检查工程所用的混凝土管、水泥、 沙石等规格,强度,性能、质量标准是否符合设计要求,选用之前需要对厂家实地考察和抽检,并抽送样品至质监站检验,经质监站检验合格才能大量选用。
二、市政给排水工程管道施工阶段施工管理
1、沟槽开挖与支护
在开挖前逐一探明地下既有管道、电缆和其他构筑物的位置,将调查结果和处理方案送交业主和相关管理单位确认,以便采取相应的保护、迁移等措施,保证开挖工作持续进行。
在沟槽开挖接近尾声时,应迅速做好管道基础准备,迅速摊铺碎石和浇筑混凝土基础,不使沟底土基暴露时间过长,造成不必要的损害。砂砾垫层按规定的沟槽(垫层)宽度铺设、摊平、压实。铺设结束后,在铺好的砂砾垫层上浇筑混凝土基础。混凝土的级配由有资质的试验室试验人员按设计规定的强度进行配合比设计,混凝土基础浇筑采用钢模板立模,管道基础第一次浇筑成水平形状,待安管后再浇管座。混凝土用插入式振动器振实后,再用平板式振动器振平及抹平,基础浇筑完毕后 2h 内不得浸水,并进行养护。
2、管道安装
(1)管材的选用和检查
管材及主要配件由选定的合格制造商提供。管材进场后,由施工方材料工程师对产品的质量进行验证。当外观检查不能确保管材的质量时,进行内、外压试验。进场的管子必须是经过专业实验室批量检验合格并取得检验合格报告的产品。
(2)下管
垫层平基验收合格后,达到一定的强度即可安管。在施工时,排管前做好清除基础表面污泥、杂物和积水,复核好高程样板的中心位置与标高。排管自下游排向上游。
下管采用人工和8t 以上汽车吊相配合。吊车沿沟槽开行至距沟边缘2m 处,以避免沟壁坍塌,影响沟槽边坡的稳定。铺管时,将管节平稳吊下,用手拉葫芦吊将管子平移到排管的接口处,用人工安排放置,调整管节的标高和轴线,使管子平顺相接。下管时用专用吊钩或柔性吊索,严禁用钢丝绳穿人管内起吊。同时有专人指挥,绑(套)管子应找好重心,平吊轻放,避免扰动基底管道相互碰撞。
在施工现场狭窄不便机械下管的地段,采用人工压绳下管。有架空线路时,保持一定的安全距离管节下人沟槽时,避免与槽壁支撑及槽下的管道相互碰撞,严格控制水平与方向。 管道的安装一定要符合质量要求:管道必须垫稳,管底坡度不得倒坡,缝宽应均匀,管道内不得有泥土、砖石、砂浆、木块等杂物,管座混凝土应捣实,与管壁紧密结合,管座回填粗砂应密实。管道铺设验收合格后,即可进行混凝土
(3)安管方法
①平基混凝土应在验槽合格后及时浇筑,终凝前不得泡水,并应进行养护。
②平基混凝土的高程应严格控制,不得高于设计高程,低于设计高程不应超过 10mm。
③平基混凝土强度达到5MPa 以上时,方可直接下管。
④安管的对口间隙为10mm。
⑤浇筑管座混凝土前平基应凿毛冲净。
⑥平基与管子相接触的三角部分,应用同等强度等级混凝土中的软灰填捣密实。
⑦浇筑管座混凝土时,应两侧同时进行,以防将管子挤偏。
(4)接口方法
①操作程序
基础和管口凿毛洗净浇筑管座混凝土将加工好的钢丝网插入管座的对口砂浆中勾捻管内下部管缝上部内缝支托架叶抹第一层水泥砂浆按钢丝网片抹第二层水泥砂浆勾捻管内上部管缝养护。
②操作要点
抹带尺寸为:带宽200mm,带厚25mm,钢丝网宽度180mm。抹带前先刷一道水泥浆,然后安装好弧形边模。
第一层砂浆厚约15mm,抹完后稍凉有浆皮儿出现时,将管座内的钢丝兜起,紧贴底层砂浆,上部搭接处用钢丝扎牢,钢丝网头应塞入网内使网表面平整。
第一层水泥砂浆初凝后再抹第二层水泥砂浆,初凝后赶快压实。抹带完成后,应立即用平软材料覆盖,3~4h 后洒水养护。
三、市政给排水工程施工完工试验与验收阶段管理
1、工程施工后期总承包单位应邀请建设单位有关人员积极参与工程收尾工作,碳钢金属管道在分段进行强度,严密性试验合格后,管段與管段相互联结的焊口和管段与管网结千焊口,在无法做强度,严密性实验时,必须进行焊缝无损探伤检验,以确保联结焊口的质量并对工程质量。
2、铸铁管道与非金属管道试验时,各施工单位在各自施工区分界线附近井下临时封闭管口,首先从排水管网中管底标高最高处并口注入水,打开相邻施工单位分界处井下被封闭的管口,使上游管段中的水向下游管段排放,直到排水管网全部试验合格为止。
3、各施工单位在管线试验期间,应设专职人员设置、记录和拆除管线临时盲板。
4、供水系统和循环水系统管网水冲洗,应与供水系统、循环水系统各种水泵试运转相结合,使两项工作同时进行。
5、排水管线冲洗时,在注水的排水井壁与井底水流冲击处用镀锌铁皮做好防护。
6、循环水管道的大口径管段,在进行人工处理时,必须要有相应的安全防护措施,并且不允许单人进入管道。
7、中间交接;试验阶段开始,总承包单位应邀请建设单位参与工程,并且对工程质量, 工程完工日期相应的了解,验收合格后,由总承包单位组织施工规范有关规定办理工程中间交接。
8、竣工交接:完成设计文件全部内容且预试车成功,工程质量达到要求,技术资料齐全并且达到要求,清理机械,办理全部工程的交接。
总之,保证市政给排水工程的施工质量对城市的正常运转、城市功能的充分发挥、道路的恢复情况、汛期的安全等都有着至关重要的作用,只有加强每一个环节的质量控制与管理, 才能防止各种质量通病的发生,提升市政排水管道工程的施工质量.
参考文献
[1]李志强,市政给排水工程施工管理的探析 [J]. 水务世界,2009.06
[2]郭明柱,市政给排水系统施工质量管理探讨[J]科技信息科学教研,2008 (15)
[3]GB50268-2008 给水排水管道工程施工及验收规范[S]
关键词:质量控制、 竣工验收、 闭水试验
Abstract: with the particularity of the construction of municipal drainage system, most network work system is buried in the ground, once the problem will affect the production unit normal production, or even cause fire, explosion, and find and solve the problems requires a longer time, therefore, water supply and drainage engineering in the construction process, management is very important the. With many years of practical experience, on how to improve the urban construction management on drainage engineering, from the preparation stage, construction stage, completion and acceptance of three stages are discussed, the only relevant staff.
Keywords: quality control, completion and acceptance, closed water test
中图分类号:TL353+.2文献标识码:A 文章编号:2095-2104(2013)
城市排水管道系统是现代化城市不可缺少的重要城市市政基础设施,也是城市水污染防治和城市排涝、防洪的骨干工程,它的任务是及时收集,输送城市产生的生活污水、工业废水和降水。其作用是及时可靠地排除城市区域内产生的生活污水,工业废水和降水,使城市免受污水之害和免受暴雨积水之灾,从而给人们创造一个舒适安全的生存和生产环境,使城市生态系统的能量流动和物质循环正常进行,维持生态平衡,保证可持续发展。
一、市政给排水工程施工准备工作
根据总体工程的施工原则,首先安排水工程开工,其目的是完成水通和场地平整,并使排水系统及早具备排水能力,为施工现场的防洪、排涝发挥作用,为主体工程施工创造条件。根据工程总体安排,应注意:
1、每条给水管线应在其服务的工号或装配试车之前完工,可根据城市规划道路的施工工期要求施工。
2、排水系统优先安排,其施工顺序为:排水泵房一排水主管线一排水支管线。
3、凡是与混凝土水池相连接的各类管道,必须等待混凝土水池试水沉降合格后,再相互连接密封。
4、编制质量计划
总承包单位质量管理部门依国家、行业有关规范和设计文件,结合本行业与本单位以往给排水工程已取得的成功经验和教训,编制给排水工程质量计划,确定施工期间的检验程序;质量控制及控制点等级;质量检验方式与方法;质量检验方式与方法;质量检验记录与质量检验报告的填写、传递、存档方法;质量事故处理制度。
5、给水工程施工管理工作应遵照国家规范,保证工期和质量完成给水管道工程的施工任务、熟悉图纸,开工前首先必须了解图纸、同甲方、监理方进行三方图纸交底;二要结合图纸深入施工现场了解本工程的基本全貌,如管线总长度、管线走向、管径、阀门井数量等,还有与工作面开挖有关地形、地貌、地物等;三是依照图纸确定的桩号走向水准测量复测一遍,避免出错。因为图纸设计前所提供地形资料存在时间预算造价问题,对此千万不可忽视。
6、编制施工组织设计总承包单位组织各施工单位有关人员勘察施工现场,依据有关工程施工规范和设计文件,编制施工组织设计。总承包单位编制给排水工程总体施工组织设计,各施工单位应有完善的给排水施工组织设计并符合排水工程体施工组织设计相应的条文。
二、市政给排水工程管道施工阶段的准备要点
1、设计图纸,施工单位在接到施工任务后,第一步需要按照施工区域的实际情况以及施工要求来设计图纸。设计图纸必须先做好调查研究,摸清地层和地下水的情况,并根据排水需要,选定排水结构的类型、位置、埋深、构造与尺寸等,为了保证施工质量施工方对这些数据的准确性要求非常严格。
2、熟悉图纸,无论对任何工程进行施工,熟悉图纸都是至关重要的第一步。对于市政排水管道工程来说,施工人员只有熟悉了图纸,结合图纸掌握了排水管线的长度、坡度、走向、管材直径、 井位数以及与施工区域有关的地形、地貌、地物等情况,才能在施工过程中有条不紊地应对一切突发事件。
3、根据给排水管道工程特点、 設计要求、 规范规定和承包人中报的施工组织设计 (包括施工工艺,施工方案、组织措施以及准备工作,各类进场技术人员,工种、材料和机具设备检验结果情况及现场施工条件等因素),将编制好的施工组织或施工方案经单位技术负责人审批后,填写施工组织专业设计报审表提交工程部、质监站和监理部会审。
4、对进场的材料,成品的质量进行严格的控制,认真检查工程所用的混凝土管、水泥、 沙石等规格,强度,性能、质量标准是否符合设计要求,选用之前需要对厂家实地考察和抽检,并抽送样品至质监站检验,经质监站检验合格才能大量选用。
二、市政给排水工程管道施工阶段施工管理
1、沟槽开挖与支护
在开挖前逐一探明地下既有管道、电缆和其他构筑物的位置,将调查结果和处理方案送交业主和相关管理单位确认,以便采取相应的保护、迁移等措施,保证开挖工作持续进行。
在沟槽开挖接近尾声时,应迅速做好管道基础准备,迅速摊铺碎石和浇筑混凝土基础,不使沟底土基暴露时间过长,造成不必要的损害。砂砾垫层按规定的沟槽(垫层)宽度铺设、摊平、压实。铺设结束后,在铺好的砂砾垫层上浇筑混凝土基础。混凝土的级配由有资质的试验室试验人员按设计规定的强度进行配合比设计,混凝土基础浇筑采用钢模板立模,管道基础第一次浇筑成水平形状,待安管后再浇管座。混凝土用插入式振动器振实后,再用平板式振动器振平及抹平,基础浇筑完毕后 2h 内不得浸水,并进行养护。
2、管道安装
(1)管材的选用和检查
管材及主要配件由选定的合格制造商提供。管材进场后,由施工方材料工程师对产品的质量进行验证。当外观检查不能确保管材的质量时,进行内、外压试验。进场的管子必须是经过专业实验室批量检验合格并取得检验合格报告的产品。
(2)下管
垫层平基验收合格后,达到一定的强度即可安管。在施工时,排管前做好清除基础表面污泥、杂物和积水,复核好高程样板的中心位置与标高。排管自下游排向上游。
下管采用人工和8t 以上汽车吊相配合。吊车沿沟槽开行至距沟边缘2m 处,以避免沟壁坍塌,影响沟槽边坡的稳定。铺管时,将管节平稳吊下,用手拉葫芦吊将管子平移到排管的接口处,用人工安排放置,调整管节的标高和轴线,使管子平顺相接。下管时用专用吊钩或柔性吊索,严禁用钢丝绳穿人管内起吊。同时有专人指挥,绑(套)管子应找好重心,平吊轻放,避免扰动基底管道相互碰撞。
在施工现场狭窄不便机械下管的地段,采用人工压绳下管。有架空线路时,保持一定的安全距离管节下人沟槽时,避免与槽壁支撑及槽下的管道相互碰撞,严格控制水平与方向。 管道的安装一定要符合质量要求:管道必须垫稳,管底坡度不得倒坡,缝宽应均匀,管道内不得有泥土、砖石、砂浆、木块等杂物,管座混凝土应捣实,与管壁紧密结合,管座回填粗砂应密实。管道铺设验收合格后,即可进行混凝土
(3)安管方法
①平基混凝土应在验槽合格后及时浇筑,终凝前不得泡水,并应进行养护。
②平基混凝土的高程应严格控制,不得高于设计高程,低于设计高程不应超过 10mm。
③平基混凝土强度达到5MPa 以上时,方可直接下管。
④安管的对口间隙为10mm。
⑤浇筑管座混凝土前平基应凿毛冲净。
⑥平基与管子相接触的三角部分,应用同等强度等级混凝土中的软灰填捣密实。
⑦浇筑管座混凝土时,应两侧同时进行,以防将管子挤偏。
(4)接口方法
①操作程序
基础和管口凿毛洗净浇筑管座混凝土将加工好的钢丝网插入管座的对口砂浆中勾捻管内下部管缝上部内缝支托架叶抹第一层水泥砂浆按钢丝网片抹第二层水泥砂浆勾捻管内上部管缝养护。
②操作要点
抹带尺寸为:带宽200mm,带厚25mm,钢丝网宽度180mm。抹带前先刷一道水泥浆,然后安装好弧形边模。
第一层砂浆厚约15mm,抹完后稍凉有浆皮儿出现时,将管座内的钢丝兜起,紧贴底层砂浆,上部搭接处用钢丝扎牢,钢丝网头应塞入网内使网表面平整。
第一层水泥砂浆初凝后再抹第二层水泥砂浆,初凝后赶快压实。抹带完成后,应立即用平软材料覆盖,3~4h 后洒水养护。
三、市政给排水工程施工完工试验与验收阶段管理
1、工程施工后期总承包单位应邀请建设单位有关人员积极参与工程收尾工作,碳钢金属管道在分段进行强度,严密性试验合格后,管段與管段相互联结的焊口和管段与管网结千焊口,在无法做强度,严密性实验时,必须进行焊缝无损探伤检验,以确保联结焊口的质量并对工程质量。
2、铸铁管道与非金属管道试验时,各施工单位在各自施工区分界线附近井下临时封闭管口,首先从排水管网中管底标高最高处并口注入水,打开相邻施工单位分界处井下被封闭的管口,使上游管段中的水向下游管段排放,直到排水管网全部试验合格为止。
3、各施工单位在管线试验期间,应设专职人员设置、记录和拆除管线临时盲板。
4、供水系统和循环水系统管网水冲洗,应与供水系统、循环水系统各种水泵试运转相结合,使两项工作同时进行。
5、排水管线冲洗时,在注水的排水井壁与井底水流冲击处用镀锌铁皮做好防护。
6、循环水管道的大口径管段,在进行人工处理时,必须要有相应的安全防护措施,并且不允许单人进入管道。
7、中间交接;试验阶段开始,总承包单位应邀请建设单位参与工程,并且对工程质量, 工程完工日期相应的了解,验收合格后,由总承包单位组织施工规范有关规定办理工程中间交接。
8、竣工交接:完成设计文件全部内容且预试车成功,工程质量达到要求,技术资料齐全并且达到要求,清理机械,办理全部工程的交接。
总之,保证市政给排水工程的施工质量对城市的正常运转、城市功能的充分发挥、道路的恢复情况、汛期的安全等都有着至关重要的作用,只有加强每一个环节的质量控制与管理, 才能防止各种质量通病的发生,提升市政排水管道工程的施工质量.
参考文献
[1]李志强,市政给排水工程施工管理的探析 [J]. 水务世界,2009.06
[2]郭明柱,市政给排水系统施工质量管理探讨[J]科技信息科学教研,2008 (15)
[3]GB50268-2008 给水排水管道工程施工及验收规范[S]