灌河大桥主塔中下塔柱呈内倾斜状的构造,在施工塔柱起步段(第一、二节)无法利用液压爬模的爬架系统时,对塔柱斜率及防模板倾覆控制就十分重要;为达到既满足塔柱斜率、模板抗倾覆的要求,又提高功效、方便施工,本文结合灌河大桥主桥主塔的起步段的施工,系统地介绍了塔柱起步段模板加固系统、施工工艺。总结了采用液压爬模系统的外模施工起步段的塔柱取得的良好效益,以积累斜拉桥主塔的施工经验。
The middle and lower pylons of the main pylon of the Gul River Bridge have an inwardly inclined structure. When the climbing system of the hydraulic climbing mold can not be used in the initial stages of the pylons (sections 1 and 2), the inclination of the pylons and the prevention of tilting of the pallets Is very important. In order to meet the requirement of tower slope and template anti-overturning, but also improve the efficiency and facilitate the construction, this paper combined with the construction of the initial section of the main tower of the main bridge of the Gul River Bridge, systematically introduced the template reinforcement system Construction technology. This paper summarizes the good benefits obtained from the tower column in the initial stage of the outer formwork construction using the hydraulic climbing system in order to accumulate the construction experience of the main tower of the cable-stayed bridge.