论文部分内容阅读
《水库调洪演算问题》一文(见原水利电力部《水利水电技术》1980年第4期)介绍了国外水库逆时序洪水演算方法,这一方法虽有突出的优点,但仍然需要准备两条工作曲线.笔者于1965年提出的调洪全图解法与上述国
The article “Calculation problem of reservoir flood regulation” (see the original water conservancy and Electric Power Ministry “water conservancy and hydropower technology” 1980 the fourth period) describes the calculation method of foreign reservoir inverse sequence flood, although this method has outstanding advantages, but still need to prepare two Working curve. The author put forward in 1965 flood regulation diagram with the above country