论文部分内容阅读
看了“钻井领域计算机应用分析和展望”我觉得相当好。专家系统可能是比较遥远的事,所以郭教授把它排在第四位,我认为是合适的,那他排在第一位的钻井工程数据库就是应该先干起来的。一九九三年八月十六日我到了彩南(东疆),准东公司所属的32845队,在彩南打开发井,井深2400米。当年182天已交井17口,进尺4万米出头,平均11天一口井,当年还有四个半月,他们计划创队年进尺60000米的记录。我看了井场,问了问情况,
Read “Analysis and Prospect of Computer Applications in Drilling Field” "I feel quite good. Expert system may be more distant things, so Professor Guo put it in fourth place, I think it is appropriate, then he ranked first in the drilling engineering database should be the first to dry up. On August 16, 1993, I went to Cunan (Dongjiang) and Zhun Dong Company’s 32845 team, opened a well in Cainan and made a depth of 2,400 meters. In the past 182 days, 17 wells had been drilled and the total footage was 40,000 meters. In the mean time, there was an average of 11 days of wells. In that year, there were still four and a half months. They plan to record a record annual footage of 60,000 meters. I saw the well site, asked to ask the situation,