论文部分内容阅读
今天的会议是春节后的第一个大会,把各单位、各部门的负责同志请来,共同研究今年的防汛工作,特别是汛前准备工作。今年黄河防汛的任务很重:确保花园口站发生22000m~3/s 以内洪水大堤不决口,遇超标准洪水,有措施,有对策;确保小浪底工程施工期安全度汛。对此,我们不能有丝毫的动摇,一定要立足于防特大洪水来安排防汛准备工作,不仅仅是防建国以来的大洪水,更要立足于防有记载以来的最大洪水。从目前有关方面的信息看,黄河流域今年来大水的可
Today’s meeting is the first conference after the Spring Festival. We invited responsible comrades from all units and departments to jointly study this year’s flood control work, especially the preparations for the flood season. This year the flood control task of the Yellow River is heavy: to ensure that Huayuankou station occurs within 22000m ~ 3 / s flood embankment does not break the mouth, case of ultra-standard floods, measures, measures; ensure Xiaolangdi flood season construction safety. In this regard, we can not waver in the slightest. We must base ourselves on preventing floods to prepare for flood control. It is not only the floods since the founding of the People’s Republic but also the biggest floods since the record date. From the current relevant information, the Yellow River this year, the flood can be