论文部分内容阅读
我国水利资源十分丰富,小水电建设有了很大发展。目前,我国已建成的小型水力发电站将近80,000座,总装机900万千瓦。单机容量500~10,000千瓦的电站占总容量的60%左右,小水电发展在我国能源建设中已成为一个不可忽视的重要方面。由于各种原因,这些电站自动化和运行管理水平都比较低,大量的电站都还以人工操作为主,这种状况已不能适应小水电发展和新形势的要
China is rich in water conservancy resources and has enjoyed great development in the construction of small hydropower. At present, China has built nearly 80,000 small hydropower stations with a total installed capacity of 9 million kilowatts. Stand-alone capacity of 500 ~ 10,000 kilowatts of the total capacity of 60% of the total capacity of small hydropower development in China’s energy construction has become an important aspect can not be ignored. Due to various reasons, the automation and operation management level of these power stations are relatively low, and a large number of power stations are still mainly operated by hand. This situation can no longer meet the needs of small hydropower development and the new situation