对库区进行淤积测量,一般是用地形测量法或断面测量法施测库区水上、水下部分的地形,据以算出水库的淤积量。但如果对水下地形测量方法不当,将会引起很大误差,使淤测前功尽弃。 昭平台水库于1979年进行了第一次淤积测量,因当时经验不足,使对水下部分的断面测量用时较长,计算较繁。1987年对库区平面控制网进行了第二次淤积测量,对水上部分,采用经纬仪确定断面方向、水准仪测高程、钢尺量距的
Sediment measurement of the reservoir area, usually by topographic survey or cross-sectional survey of the reservoir area of water, underwater part of the terrain, so as to calculate the reservoir sedimentation. However, if the method of measuring the underwater topography is not correct, it will cause a great error, so that siltation test dumped. Zhaopingtai Reservoir carried out the first siltation survey in 1979 because of the lack of experience at that time, which made the cross-section measurement of the underwater part take longer and calculated more. In 1987, the second siltation survey was carried out on the plane control network in the reservoir area. For the waterborne section, the theodolite was used to determine the direction of the cross section, the level elevation, the gauge of the steel rule