黄龙滩水电站位于汉江支流堵河下游。坝址属副热带季风区,气候温和,雨量丰沛,多年平均气温16.1℃,冬季无冰冻现象。 坝址左岸为引水式地面厂房,装机2×7.5万千瓦;右岸为30吨两级垂直升船机。 拦河坝为混凝土重力式,最大坝高107米,坝顶总长371米,共22个坝段(右岸2~#~6~#、左岸15~#~23~#为非溢流坝段;7~#~13~#为溢流坝段;14~#为泄水孔坝段)。各主要建筑物平面布置见图1。 拦河坝混凝土总量98万米~3,接缝灌浆面积共2.98万米~2,207个灌浆区。工程于1969
Huanglongtan Hydropower Station is located in the Hanjiang River tributary of the downstream. The dam site is a subtropical monsoon region, with a mild climate and abundant rainfall, with an average annual temperature of 16.1 ℃ and no freezing in winter. The left bank of the dam is a diversion ground plant with an installed capacity of 2 × 75 MW and a right-wing 30-ton two-stage vertical shiplift. The dam is a concrete gravitational type with a maximum height of 107 meters and a total length of 371 meters. There are 22 dam sections (2 ~ # ~ 6 ~ # on the right bank and 15 ~ # ~ 23 ~ # on the left bank) # ~ 13 ~ # for the overflow dam section; 14 ~ # for the drainage hole dam section). The main building layout shown in Figure 1. The total amount of barrage concrete is 980,000m 3, and the joint grouting area is 29,800m 2,207 grouting areas. Engineering in 1969