论文部分内容阅读
整风之后,工人日报编委会重视了提早出版时间这个问题,研究了过去迟出报的原因,抓紧了编辑组这一关键部门,同时针对排字、制版等薄弱环节,采取了许多有效措施,这样,出版时间有了保征。今年二月份二十一天中,三时以前开印的十五次,四时前开印的六次。自二月十九日编辑部有关组和工厂有关各股订了提早编印二,三版的互助协作合同以后,三时以前印报有了更大的保证。过去报纸长期不能按时出版,有种种原因。工厂人力不足,不能分成两班作业,技术熟练的拼版工人不多,拖长了拼版时间。制版房人力也不足,白天无人上班。而锌版每块的制作时间又需要两三小时;本报的活和外活如果挤到一起,工人往往顾此失彼,发生停工等制版的现象。工厂抱怨编辑发稿晚,前松后紧。
After the rectification, the editorial board of the Workers Daily attached importance to the issue of early publication time, studied the reasons for the delay in making announcements in the past, paid close attention to the editorial team as a key department, and adopted many effective measures to address the weak links such as typesetting and plate making. , Publishing time with the insurance levy. In the twenty-one days of February this year, fifteen times were printed before three o’clock and six times before four o’clock. Since February 19, the editorial department of the relevant group and the factory has subscribed to the early version of the second and third editions of the mutual cooperation and cooperation contract, the printing of newspapers by the time there is a greater guarantee. There have been many reasons why the newspapers could not be published on time in the long run. Factories lack of manpower, can not be divided into two shifts, skilled little imposition of workers, dragging the imposition of time. Plate-making room manpower is also insufficient, no daytime work. The production of zinc version of each block takes another two or three hours; newspaper live and live together if squeezed together, workers often take this one loss, the phenomenon of stoppage and other plate. The factory complained that editing was late, and the looseness was tight.