论文部分内容阅读
2011年7月26日,“轨道交通U型梁架设现场观摩交流会”在上海举行,80多位轨道交通行业内的专家学者以及设计单位和工程施工单位的代参加了观摩交流会。与会代表首先在现场观摩了上海轨道交通16号线南段8标段工程的U型梁架设施工过程,之后举行了轨道交通
On July 26, 2011, “On-site Observation and Exchange Meeting for U-beam Rail Transit Installation” was held in Shanghai. More than 80 experts and scholars from the rail transit industry, as well as representatives from design institutes and construction companies, participated in the exchange meeting. The participants firstly observed the U-beam erection process of the 8th section of the southern section of Shanghai Metro Line 16 on the ground, and then held the rail transit