《无井架电动爬模工艺在180m烟囱施工中的应用》一文在《建筑技术》1989年第2期发表后,收到了许多读者的来信,探讨该工艺在烟囱特殊部位施工和内、外爬架下落及操作平台整体下落的问题,现答复如下: 一、烟囱牛腿处施工:为使烟囱内爬架遇牛腿时能顺利爬升,要在内爬架和筒壁上固定的爬升靴间连件(插板)上做文章,该插板有效长度应大于筒壁牛腿挑出的距离。为确保整个操作平台安全顺利爬升,建议将内爬架承重改为外爬架承重。二、105m处信号平台的施工:当爬架爬升到105m处信号平台位置时,可在爬架上安装两架间
The article “Application of Electric Deckless Climbing Moulding Technique in 180m Chimney Construction” published in “Building Technology” in the 2nd issue of 1989, received a letter from many readers to discuss the construction of the special part of the chimney and the internal and external climbing frames. The problem of the whereabouts of the whereabouts and the overall fall of the operation platform is as follows: 1. Construction at the chimney and cow legs: To ensure that the chimney can climb smoothly when encountering a calf, the climbing boots must be fixed on the inner climbing frame and the wall of the cylinder. Make a fuss on the piece (board), the effective length of the board should be greater than the distance picked by the drum wall leg. In order to ensure safe and smooth climbing of the entire operation platform, it is recommended to change the weight of the inner climbing frame to the weight of the outer climbing frame. 2. Construction of the signal platform at 105m: When the climbing frame climbs to the signal platform position at 105m, two frames can be installed on the climbing frame.