论文部分内容阅读
当安装柴油机等动力设备的地点都是坚硬岩层,敷设基枕木很困难肘,我们采用了一种简便的“钻眼灌注”法,其施工程序如下:(图1)
When installing diesel engine and other power equipment in hard rock formations, it is very difficult to install base sleepers. We have adopted a simple “hole filling” method. The construction procedure is as follows: (Figure 1)